Page not found

Search results

  1. Accessory Dwelling Unit

    Development Services | Project

    17.34.10 lists accessory dwelling units as an accessory use permitted outright in the SFR zoning district ... evidence is requested, a statement relating the request to the factors listed in Chapter 17.28.50; and, 5. ...

  2. Tree Removal- 39480 Kimberly Dr.

    Planning | Project

    located on a hillside is hereby approved as modified by the conditions listed below. 21-054 TREE 39480 ... testimony and other evidence is requested, a statement relating the request to the factors listed in Chapter ...

  3. ITB Deer Pointe Park Construction

    Parks and Recreation | Bid/RFP

    not required for that item. Unit prices are only required where N/A is not listed. Q4. The civil plan ... clarify other site furnishings other than those listed. A34. The list shown in the specification section ... project. Q41. Also, is there a complete list of what is owner furnished and owner installed? We are getting ...

  4. Planning Commission Meeting

    Planning Commission | Calendar Event | 10/26/20 07:00pm

    staff to include the Parks and Trails Advisory Board minutes in the exhibits list. He also explained ... proposal includes a comprehensive plan map amendment. 4. This report is based upon the exhibits listed in ... Multi-family is listed as a permitted outright use in the R-2 zoning district in Section 17.38.10(A)(6). Even ...

  5. Planning Commission Meeting

    Planning Commission | Calendar Event | 06/26/23 06:30pm

    ranging from 3 to 45 inches DBH (See Attachment #2 – the Master Tree List). 1 Chapter 17.92.10 C. ... ‘Good’ to ‘Very Poor’. A list of the trees is provided in Attachment 2. Table 1. Tree summary by area of ... 4 non-significant trees that are growing on the existing and planned new rights-of-way. A list is provided in ...

  6. Sanitary Sewer Rehab ~ Constrtuction Manager / General Contractor

    Public Works | Bid/RFP

    Amendment Add Attachment D – GMP Amendment Mandatory Pre-proposal Attendee List Name Firm E-mail In ... dimensions, and details of the Work to be done under the Contract. PUNCHLIST, means the list of Work yet to be ... documents listed in Subsection B.9.1 of these General Conditions, recording all Services performed. ...

  7. Water

    Public Works | Page

    CLICK HERE TO LEARN ABOUT THE DRINKING WATER SYSTEM REINVESTMENT PROJECT. The City of Sandy provides water service to customers within city limits and in some surrounding areas.  For Public Works and Utilities issues (water, sewer, streets, storm drainage ...

  8. Creekside Loop Appeal Re: File 20-049 ADJ

    Development Services | Project

    original adjustment requests, which includes both a Type I and Type II garage setback adjustment. LIST OF ... a statement relating the request to the factors listed in Chapter 17.28.50; and, 5. Payment of required filing ... Zoning Designation__________ Acres Request: I am the (check one) … owner … lessee of the property listed ...

  9. Request for Proposals- Sandy Wastewater Program- Consulting Environmental and Engineering Services

    Public Works | Bid/RFP

    a temperature mitigation alternatives analysis. These services will include: • A list of temperature mitigation ... objectives and tasks listed in the statement of work. Describe how the approach will benefit the City and the ... Provide the involvement of proposed key personnel on the listed projects. 6. References (15 points) ...

  10. Lot Line Adjustment- Paul Reeder

    Development Services | Project

    evidence is requested, a statement relating the request to the factors listed in Chapter 17.28.50; and, 5. ... approved, this proposal must meet the approval criteria or standards of the Sandy Development Code listed on ... comments to planning@ci.sandy.or.us or the staff contact listed below. APPLICABLE MATERIALS: All documents ...

Pages